PMB Bobertag - Fachwissen aus der Auswuchttechnik
How can throughput in manual balancing be nearly doubled?
By performing unbalance measurement and unbalance correction in parallel, throughput in manual balancing can be significantly increased. With the JobList system and JobListStation from PMB Bobertag, measurement results are stored centrally and correction instructions are transferred to separate correction stations. This allows measurement and correction to be carried out independently and simultaneously. Under suitable process…